Project Details
Down-stacker upgrade
(Portugal
)
NEE made this upgrade following a long-term plan decided by the customer. So in some year, the two levels of the stacker have been almost completely upgraded, by ending with the stacking head. Because the bottom level was already equipped of hydraulic platform, the customer decided to make the same on the second level, nevertheless platform electrically driven could easily supplied.back to Dry End index page
Recent Entries







